By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
BublikArt GalleryBublikArt Gallery
  • Current
  • Art News
  • Art Exhibitions
  • Artists
  • Art Collectors
  • Art Events
  • About
  • Collaboration
Search
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Iceland plans national gallery overhaul
Share
Notification Show More
Font ResizerAa
BublikArt GalleryBublikArt Gallery
Font ResizerAa
Search
  • Current
  • Art News
  • Art Exhibitions
  • Artists
  • Art Collectors
  • Art Events
  • About
  • Collaboration
  • Advertise
2024 © BublikArt Gallery. All Rights Reserved.
BublikArt Gallery > Blog > Art News > Iceland plans national gallery overhaul
Art News

Iceland plans national gallery overhaul

Irina Runkel
Last updated: 16 October 2024 12:00
Published 16 October 2024
Share
5 Min Read
SHARE



Iceland is considering building a new space for its National Gallery to boost the profile of Icelandic art history and provide appropriate conditions for its collections after a report highlighted serious deficiencies in the museum’s existing spaces.

The national gallery, home to around 16,000 works, mostly from the 19th and 20th centuries, is currently housed across three locations in the capital of Reykjavik. These comprise a main site at Fríkirkjuveg, opposite the picturesque Tjörnin Lake in the city centre; the recently opened House of Collections; and the home and studio of the painter Ásgrímur Jónsson, open by appointment.

The culture minister, Lilja Alfreðsdóttir, published a new policy paper in May 2023 calling for a flourishing art sector that gains prominence locally and internationally. The policy paper’s action plan established a working group of independent experts to assess the national gallery and “form a future vision for the development of a world-class national gallery”.

The report, submitted in April, found several key areas where the museum was not fulfilling its mission. The site’s buildings were found particularly wanting.

“The exhibition spaces in the main building have significant limitations”, while the “hidden away” entrance of the main museum undersells the site, Mikkel Bogh, the former director of Copenhagen’s Statens Museum for Kunst (SMK), wrote in the report. In addition, he said, “The conditions for storage and conservation work are downright alarming from a museum professional’s perspective”. A leak in one of the main storage rooms meant that gallery staff recently had to move part of the collection of works on paper before a storm to avoid damage, according to Ingibjörg Jóhannsdóttir, the museum’s director.

Without suitable space to show, store and research art, the gallery has been unable to conserve or display some of the nation’s most important works. As a result, Jóhannsdóttir says, “the story of Icelandic art history has not been told.”

The Fríkirkjuveg location recently underwent renovation, but the gallery’s two main sites comprise only around 2,000 sq. m of “exhibition and media” space. The report found that around 4,500 to 5,800 sq. m is needed, and another 6,000 sq. m for storage and research.

Architectural competition

Several solutions are proposed, from expanding the current Fríkirkjuveg site to creating an entirely new space elsewhere in the city – perhaps close to Reykjavik’s impressive Harpa concert hall, built in 2011.

“I have a dream that we have built a visual arts museum that is located at the bay, by the Harpa music centre, and that you could cycle or walk between them,” says Alfreðsdóttir, the culture minister.

The cost of a new site is estimated at 15bn Icelandic krona (around $108m), a sum Alfreðsdóttir thinks is achievable. “Iceland is one of these countries that has abundant resources, whether it’s energy, fish, and we are a very popular destination, so we’re going to see growth of around 2%-5% in the next 20 years,” she says. The creative industries receive around 1.3% of the nation’s GDP in public funding, her ministry says, among the highest share in Europe. She hopes she can launch an architectural competition for an entirely new site before her term ends in autumn 2025.

Jóhannsdóttir says she would like to at least have a “clear plan forward” in the next two years, and for a new storage space to be available within that window. “I can just see it in my mind, how beautiful it would be to see the different dialogues we could make. There are just some incredible works that we’d love to have on display all the time.”

You Might Also Like

To help preserve her works, Cindy Sherman is offering to destroy and reprint old photographs

Louvre forced to close after staff walk out protesting overcrowding

Israeli attacks on Palestinian heritage amount to war crimes, UN report finds

The Best Large-Scale Works at Art Basel Unlimited 2025

Mystic Seaport Museum exhibition chronicles whale oil industry’s far-reaching impact

Share This Article
Facebook Twitter Email Print
Previous Article Interiority is Complex: Rashid Johnson at Hauser & Wirth, Paris
Next Article How to Make Money as an Artist
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

BublikArt GalleryBublikArt Gallery
2024 © BublikArt Gallery. All Rights Reserved.
  • Privacy Policy
  • Security
  • About
  • Collaboration
  • Contact
Welcome Back!

Sign in to your account

Lost your password?