By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
BublikArt GalleryBublikArt Gallery
  • Current
  • Art News
  • Art Exhibitions
  • Artists
  • Art Collectors
  • Art Events
  • About
  • Collaboration
Search
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: LACMA Ends South Los Angeles Project After Exceeding Costs
Share
Notification Show More
Font ResizerAa
BublikArt GalleryBublikArt Gallery
Font ResizerAa
Search
  • Current
  • Art News
  • Art Exhibitions
  • Artists
  • Art Collectors
  • Art Events
  • About
  • Collaboration
  • Advertise
2024 © BublikArt Gallery. All Rights Reserved.
BublikArt Gallery > Blog > Art Collectors > LACMA Ends South Los Angeles Project After Exceeding Costs
Art Collectors

LACMA Ends South Los Angeles Project After Exceeding Costs

Irina Runkel
Last updated: 18 September 2024 22:29
Published 18 September 2024
Share
2 Min Read
SHARE


LACMA has officially ended plans to establish a satellite campus at the South Los Angeles Wetlands Park in what was part of a 2017 project to “de-center” the museum and expand reach to different parts of the city. The project suffered higher costs than it had initially anticipated.

According to a staff memo published this week by the Los Angeles Board of Recreation and Parks Commissioners, who oversee the city’s public building projects, LACMA submitted a termination agreement on the project to their office in July. The agreement took effect on September 12.

The proposed site, termed under the agreement as Building 71, spans 84,000-square-feet and was previously operated as a public transit facility. The Board of Recreation and Park Commissioners report stated that engineering studies conducted as part of the plan “have shown that the cost to repair and retrofit Building 71 will far exceed what LACMA had initially estimated.” In 2017, Michael Govan’s president estimated the project to cost $25 million.

LACMA had planned for the satellite campus to serve as an additional storage and exhibition space for its 150,000-item collection pieces. Meanwhile, a partnership approved by Govan to lend portions of the museum’s collection and installations to the forthcoming Las Vegas Museum of Art are moving forward. Architects for the Nevada project were announced this month and the $150 million museum complex is expected to open in 2028.

You Might Also Like

Pittsburgh Sculptor Dies at 99

Charles Bronson’s Art Will Head to Auction

Russian Hermitage Archaeologist Arrested in Poland Over Crimean Excavations

Zanele Muholi Wins 2026 Hasselblad Award for Photography

Robert Mnuchin Collection to Sell at Sotheby’s, Led by $100 M. Rothko

Share This Article
Facebook Twitter Email Print
Previous Article One Whale of a Meal Wins The 2024 Ocean Photographer of the Year Competition — Colossal One Whale of a Meal Wins The 2024 Ocean Photographer of the Year Competition — Colossal
Next Article How Will the Fed’s Lowering Interest Rates Affect the Art Market? How Will the Fed’s Lowering Interest Rates Affect the Art Market?
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

BublikArt GalleryBublikArt Gallery
2024 © BublikArt Gallery. All Rights Reserved.
  • Privacy Policy
  • Security
  • About
  • Collaboration
  • Contact
Welcome Back!

Sign in to your account

Lost your password?